In addition, all product that ships via common carrier is boxed (in most cases with custom designed and fitted boxes), shrink wrapped and banded multiple times to custom, hard oak skids. Should product not meet these requirements, upon mutual agreement between customer and Roof Drainage Components said product will be replaced or, if acceptable to both parties, retained at a mutually acceptable value.Īll painted product is either paper interleaved, bagged with 4 mil thick plastic bags and/or protected with PVC protective film to protect the painted surfaces during transit. Having said that, regarding quality of work, except for some possible minor surface scratches to paint systems due to transportation and/or fabrication, all products will be free from surface defects and shall be water tight where applicable. Roof Drainage Components has built its business based upon delivering high quality products on or before specified delivery date. If an error is made by Roof Drainage Components, Roof Drainage Components will either replace the product(s) for which the error was made and/or repair said product, at no charge to the customer. will supply all products as specified by the customer including metal substrate, paint color and paint system (if applicable), dimensional specifications and product quantity. Roof Drainage Components & Accessories, Inc. Corrugated Rectangular Downspout System.Most colors meet LEED, Energy Star and Cool Roof Rating Council certification requirements.
#Pac clad patina green full#
All provide the well-known Petersen quality and are available in full 70 percent PVDF finish in 45 colors on steel and aluminum. Petersen is long-recognized for its PAC-CLAD metal standing seam roofing products, and also offers metal wall panels including exposed fastener panels, flush panels, composite wall panels, fascia and coping systems, and column covers. The Petersen distributor on the project was Brock Associates in Pittsburgh. And the use of the PAC-CLAD had a lot to do with it,” he said. “I couldn’t be happier with the way the project turned out.
![pac clad patina green pac clad patina green](https://st.hotrod.com/uploads/sites/21/2018/03/026-zip-tie-drags-roadkill-green-hornet.jpg)
But the corrugated really turned out great.”Īrchitect Lubetz agrees. That made installation of some of the outside corners a little challenging. This job was relatively straightforward, although the building was irregular and didn’t have many 90-degree corners. “We see corrugated popping up all over the place. The architect really did a nice job of mixing and matching the colors,” Stein says.Ĭorrugated metal continues to be a popular architectural material, Stein notes. It’s almost an amusement park appearance that the kids really like. “It certainly sets itself apart from the other construction in the area. Project manager Skip Stein likes the look of the new building. Installation of Petersen’s PAC-CLAD material was done by general contractor Franjo Construction in Pittsburgh. The contractor bid it out and the price was right.” We got involved with Petersen because we like their colors. PAC-CLAD corrugated metal would be the most economical, long-lasting material we could use. “We had an extremely minimal budget for the project. “As soon as we knew we wanted the building to be colorful, metal became the obvious choice for the exterior,” Lubetz says.
![pac clad patina green pac clad patina green](https://www.awningguy.com/wp-content/uploads/2019/03/Standing-Seam-Metal-Awnings-Paratech-Frankfort-IL-768x576.jpg)
The decision to use metal as the primary exterior façade material was made fairly early in the design process. 032” aluminum panels were finished in Copper Penny, Silver, Cardinal Red, Award Blue and Patina Green. So we came up with the idea of literally surrounding the building with simple, elemental blocks that would be individually colored so that we would have this pulsating, dynamic structure,” Lubetz says.Īpproximately 2,600 square feet of PAC-CLAD 7/8-inch Corrugated Panels in five different colors was just what the design team was looking for. “But it was such an unattractive structure that we just couldn’t do it. Front Studio Architects initially was hired to design an addition on the back of the existing library building.